Greek Family Farm – Industrial HVAC & Refrigeration
Project overview Feta Cheese Production Plant Feta Production Room: Ventilation, vapor discharge in environment Air conditioning at + 27 ° C Heating to + 16 °C at start of cheese
Project overview Feta Cheese Production Plant Feta Production Room: Ventilation, vapor discharge in environment Air conditioning at + 27 ° C Heating to + 16 °C at start of cheese
Project Objective: Upgrading the air conditioning of a cheese factory in Elassona, Thessaly. Dairy Elassona, Greece 2019 Production rooms that upgraded: Pasteurization Engine Room Basque Production Basque Maturation Brining VAT
Dairy Domokos, Greece 2017 Project Objective: Achieving ISO 8 clean space conditions with temperature and humidity control in two “Katiki” rooms at the factory in Domokos. These conditions were achieved
An Engineering – Contracting & Validation Company, specialized in: Industrial HVAC Systems | Industrial Refrigeration | Cleanroom Design, Construction and Validation | Special Air Applications for Industrial Environments (Dry Applications, Degassing Systems etc)
Copyright 2024 © BCT – Group – All Rights Reserved.
Copyright 2022 © BCT – Group – All Rights Reserved.
Designed by Booms