Steel pipes and hollow sections manufacturer
Thisvi, Voiotia
2023
CPW (Corinth Pipe Works) factory of the Stassinopoulos Group once again entrusted the expertise of the BCT Group and Automation & Power. The collaboration of all involved parties yielded excellent results, successfully completing the pipe cooling system at their intermediate welding stages.
BCT-Group was responsible for the study, design and installation.
The project included the installation of the following equipment:
- Two Central Air Conditioning Units (CACUs)
- An air-cooled glycol solution cooling system
- Adjustable height fabric ductwork within the room
- Ductwork networks outside the building
- Piping networks inside and outside the production room
- Electrical power and automation panels
- Electrical power and automation wiring