chipita poland 2

Chipita Poland – Industrial HVAC & Refrigeration

chipita poland 2

Chipita Poland – Industrial HVAC & Refrigeration

Confectionary & Sweets

Tomaszów, Mazowiecki

2018

Project scope was:

Design & installation of Ventilation & Air conditioning systems in the new Croissant Production Line

Project requirements:
Outdoor Design conditions
  • Summer: Dry bulb Temp. 32oC, Wet bulb Temp. 23oC, (RH=47%)
  • Winter: Dry bulb Temp. -18oC, RH=40%
Indoor Zones Temperatures
  • Summer: Dry bulb Temp. 27°C
  • Winter: Dry bulb Temp. 18°C

With our specialized solutions we manage to provide significant added-value in the operation, hygiene, energy conservation and sustainability of the HVAC system benefiting our client by helping him to produce high quality products with cost efficiency.

Latest Hightlights
Subscribe to our Newsletter

Relevant Projects

General Mills – Cleanroom

Chocolate & Sweets Oinofyta, Greece 2021 Design and construction of Cleanroom 550 m2 and Cleanroom HVAC system for the new production line and packaging of tortillas of General Mills International.

Read More »